trial · active
Howmet Follow-up — SNX-680
Post-briefing customer report and follow-up for Howmet aerospace application.
Owner: John
Due: 2026-07-08
64% complete
Current Step — Guided Execution
Generate Customer Report
Draft customer-facing trial report.
Instructions
File report to SharePoint. Link Knowledge Workspace.
Completion criteria: Report filed with M365 ref.
Open knowledge moduleWorkflow Builder
Stages, tasks, dependencies, and M365 attachments
Intake
Request and engineering briefing
Task 1
Receive Trial Request
Capture trial request from sales or customer.
Task 2
Prepare Engineering Briefing
Compile technical context.
Depends on: wf-ttw-step-01-receive
Open moduleTask 3
Assign Application Engineer
Assign AE and schedule kickoff.
Depends on: wf-ttw-step-02-briefing
Preparation
Products and trial setup
Task 4
Prepare Products
Select wheels and arrange shipment.
Depends on: wf-ttw-step-03-assign-ae
Open moduleExecution
Conduct trial and data entry
Task 5
Conduct Trial
Execute trial on customer site.
Depends on: wf-ttw-step-04-prepare-products
Open moduleTask 6
Enter Run Data
Enter trial run data and photos.
Depends on: wf-ttw-step-05-conduct-trial
Analysis
Review results and reporting
Task 7
Review Analytics
Engineering analytics review.
Depends on: wf-ttw-step-06-enter-run-data
Open moduleTask 8
Generate Customer Report
Draft customer-facing trial report.
Depends on: wf-ttw-step-07-review-analytics
Open module← Current step
Task 9
Capture Knowledge
Document lessons learned.
Depends on: wf-ttw-step-08-customer-report
Closeout
Customer follow-up and archive
Task 10
Schedule Customer Follow-up
Plan post-trial engagement.
Depends on: wf-ttw-step-09-capture-knowledge
Open moduleTask 11
Close Trial
Close workflow and archive.
Depends on: wf-ttw-step-10-schedule-followup
History
Approval requested: Customer Report Review — Howmet
John · 7/2/2026, 10:00:00 AM
Approvals
- Customer Report Review — Howmetpending · Sarah Chen
Connected Workspaces
Odoo: odoo-lead-howmet
Facility: fac-howmet-whitehall
AI Hooks
Placeholder — no API callsComplete "Generate Customer Report" — File report to SharePoint. Link Knowledge Workspace.…
/api/integrations/ai-assistant/workflows/suggest-next-task
No elevated risks detected.
/api/integrations/ai-assistant/workflows/risk-detection
Howmet Follow-up — SNX-680 is 58% complete at step "Generate Customer Report". Owner: John. Due 2026-07-08.
/api/integrations/ai-assistant/workflows/summary
Workflow active: Post-briefing customer report and follow-up for Howmet aerospace application.… Key milestone due 2026-07-08.
/api/integrations/ai-assistant/workflows/executive-brief