Live Mode — connected to Odoo / Microsoft 365
SlipNaxos

Steel Dynamics Bloom Trial — SNX-680

trial · active

Steel Dynamics Bloom Trial — SNX-680

Active bloom grinding trial at Steel Dynamics Midwest. Weekly performance reviews with mill superintendent.

Owner: John

Due: 2026-07-15

45% complete

CustomerTrialProductProgramOdoo: odoo-lead-sd-bloom-2026

Current Step — Guided Execution

Enter Run Data

Enter trial run data and photos.

Instructions

Complete all run entries in Trial Intelligence.

Completion criteria: All run data entered.

Workflow Builder

Stages, tasks, dependencies, and M365 attachments

Intake

Request and engineering briefing

Task 1

Receive Trial Request

Capture trial request from sales or customer.

completed
Owner: Sarah Chen
Due: 2026-07-10
Est: 60 min
Open module

Task 2

Prepare Engineering Briefing

Compile technical context.

completed
Owner: John
Due: 2026-07-11
Est: 120 min

Depends on: wf-ttw-step-01-receive

Open module

Task 3

Assign Application Engineer

Assign AE and schedule kickoff.

completed
Owner: John
Due: 2026-07-12
Est: 30 min

Depends on: wf-ttw-step-02-briefing

Preparation

Products and trial setup

Task 4

Prepare Products

Select wheels and arrange shipment.

completed
Owner: Mike Torres
Due: 2026-07-13
Est: 180 min

Depends on: wf-ttw-step-03-assign-ae

Open module

Execution

Conduct trial and data entry

Task 5

Conduct Trial

Execute trial on customer site.

completed
Owner: John
Due: 2026-07-14
Est: 480 min

Depends on: wf-ttw-step-04-prepare-products

Open module

Task 6

Enter Run Data

Enter trial run data and photos.

overdue
Owner: John
Due: 2026-07-05
Est: 120 min

Depends on: wf-ttw-step-05-conduct-trial

← Current step

Analysis

Review results and reporting

Task 7

Review Analytics

Engineering analytics review.

pending
Owner: John
Due: 2026-07-16
Est: 90 min

Depends on: wf-ttw-step-06-enter-run-data

Open module

Task 8

Generate Customer Report

Draft customer-facing trial report.

pending
Owner: John
Due: 2026-07-17
Est: 180 min

Depends on: wf-ttw-step-07-review-analytics

Open module

Task 9

Capture Knowledge

Document lessons learned.

pending
Owner: John
Due: 2026-07-18
Est: 45 min

Depends on: wf-ttw-step-08-customer-report

Closeout

Customer follow-up and archive

Task 10

Schedule Customer Follow-up

Plan post-trial engagement.

pending
Owner: Sarah Chen
Due: 2026-07-19
Est: 30 min

Depends on: wf-ttw-step-09-capture-knowledge

Open module

Task 11

Close Trial

Close workflow and archive.

pending
Owner: Mike Torres
Due: 2026-07-20
Est: 15 min

Depends on: wf-ttw-step-10-schedule-followup

History

  • Started step: Enter Run Data

    John · 7/2/2026, 8:00:00 AM

  • Completed step: Conduct Trial — 3 production runs logged on site

    John · 7/1/2026, 6:00:00 PM

Approvals

  • Engineering Analytics Review — Steel Dynamics Bloompending · Sarah Chen

Connected Workspaces

Odoo: odoo-lead-sd-bloom-2026

Facility: fac-steel-dynamics-midwest

AI Hooks

Placeholder — no API calls
Suggested Next Task

Complete "Enter Run Data" — Complete all run entries in Trial Intelligence.…

/api/integrations/ai-assistant/workflows/suggest-next-task

Risk Detection

No elevated risks detected.

/api/integrations/ai-assistant/workflows/risk-detection

Workflow Summary

Steel Dynamics Bloom Trial — SNX-680 is 42% complete at step "Enter Run Data". Owner: John. Due 2026-07-15.

/api/integrations/ai-assistant/workflows/summary

Executive Brief

Workflow active: Active bloom grinding trial at Steel Dynamics Midwest. Weekly performance reviews with mill superintendent.… Key milestone due 2026-07-15.

/api/integrations/ai-assistant/workflows/executive-brief

SlipNaxos Executive OS